Pearson Pump Station Replacement
Gc bidding · Washington · Last reported Dec 2024
Source: Dodge USA
Contractor shall abandon and relocate an existing sewer pump station. Work to be performed includes construction & modifications on existing wet-well, electrical building including installation of pre-purchased SCADA equipment (Motor Control Center & Remote Telemetry Unit), other telemetry controls, onsite modifications and all appurtenances as shown on the plans and specified herein.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Vancouver, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pearson Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall abandon and relocate an existing sewer pump station. Work to be performed includes construction & modifications on existing wet-well, electrical building including installation of pre-purchased SCADA equipment (Motor Control Center & Remote Telemetry Unit), other telemetry controls, onsite modifications and all appurtenances as shown on the plans and specified herein. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
