Pebble Creek Hole 10 Pond Improvement Project
Sector: Water Supply and Storage • Location: Becker, Minnesota, United States
Source: Patriot News MN
The project involves replacing the current clay liner of the Hole 10 pond with an impermeable liner to allow the pond to collect storm water from local CSAH 23 and maintain a desirable water level for the golf course, reducing groundwater use. G&M Companies, Inc. was contracted to perform the work and install a pipe connecting the pond on Hole 10 to the pond on Hole 4.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves replacing the current clay liner of the Hole 10 pond with an impermeable liner to allow the pond to collect storm water from local CSAH 23 and maintain a desirable water level for the golf course, reducing groundwater use. G&M Companies, Inc. was contracted to perform the work and install a pipe connecting the pond on Hole 10 to the pond on Hole 4. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
