logo
ProjectStart

Pebbles Beach Stair Replacement and Slope Stabilization

Sector: Forest Products and Packaging • Location: Gibsons, British Columbia, Canada

Source: Dodge USA

Demolition and removal of existing beach access concrete staircase; Demolition of existing timber crib retaining walls, and associated slope stabilization measures; Construction of 20 m concrete staircase, shallow foundations, and associated finishing; Drainage improvements and construction of perforated pipe drainage pathway; and, Site revegetation and plantings.

Status
Prospective
Sector
Forest Products and Packaging, Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Government
Location
Gibsons, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pebbles Beach Stair Replacement and Slope Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pebbles Beach Stair Replacement and Slope Stabilization” is an infrastructure initiative in the Forest Products and Packaging sector, located in Gibsons, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Demolition and removal of existing beach access concrete staircase; Demolition of existing timber crib retaining walls, and associated slope stabilization measures; Construction of 20 m concrete staircase, shallow foundations, and associated finishing; Drainage improvements and construction of perforated pipe drainage pathway; and, Site revegetation and plantings.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Gibsons

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Water Supply and Storage, Commercial, Cement, Waste Processing and Treatment, Government

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project