Pecan 1A Upstream Project
Sector: Oil and Gas • Location: Ghana
Source: ZAWYA
The Pecan 1A Upstream Project in Ghana aims to develop 268 million barrels of oil across two phases, with production expected to begin in 2025. The project is developed by Aker Energy, the Ghana National Petroleum Corporation (GNPC), and Lukoil, with a total cost of $3.5 billion.
- Status
- Prospective
- Sector
- Oil and Gas, Government
- Location
- Ghana
- Updated
- 19 Nov 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Pecan 1A Upstream Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Pecan 1A Upstream Project in Ghana aims to develop 268 million barrels of oil across two phases, with production expected to begin in 2025. The project is developed by Aker Energy, the Ghana National Petroleum Corporation (GNPC), and Lukoil, with a total cost of $3.5 billion. |
Original sector | Energy |
Budget |
Location
Country | Ghana |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Government |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
