logo
ProjectPlanned

Pecan 1A Upstream Project

Sector: Oil and Gas • Location: Ghana

Source: ZAWYA

The Pecan 1A Upstream Project in Ghana aims to develop 268 million barrels of oil across two phases, with production expected to begin in 2025. The project is developed by Aker Energy, the Ghana National Petroleum Corporation (GNPC), and Lukoil, with a total cost of $3.5 billion.

Status
Prospective
Sector
Oil and Gas, Government
Location
Ghana
Updated
19 Nov 2026
Source
ZAWYA

ConstructChat

Ask ConstructChat about Pecan 1A Upstream Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pecan 1A Upstream Project” is an infrastructure initiative in the Oil and Gas sector, located in Ghana. Taiyo aggregates data on it from ZAWYA.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Pecan 1A Upstream Project in Ghana aims to develop 268 million barrels of oil across two phases, with production expected to begin in 2025. The project is developed by Aker Energy, the Ghana National Petroleum Corporation (GNPC), and Lukoil, with a total cost of $3.5 billion.

Original sector

Energy

Budget

Location

Country

Ghana

Source

Source

ZAWYA

URL

More Details

Record type

Project

Sector

Oil and Gas, Government

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project