Pecan Hollow Golf Course Erosion Control for Holes 6 & 7
Sector: Water Supply and Storage • Location: Plano, Texas, United States of America
Source: Dodge USA
The scope of work is the construction of stream bank stabilization improvements for site A1 and A2 along with a golf cart trail alignment adjustment for site F in the Pecan Hollow Golf Course. Site A1 consists of stabilization of approximately 315 LF of the eroded north bank near the golf course cart path. Site A2 consists of stabilization of approximately 220 LF of the eroded south bank near the
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Plano, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pecan Hollow Golf Course Erosion Control for Holes 6 & 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work is the construction of stream bank stabilization improvements for site A1 and A2 along with a golf cart trail alignment adjustment for site F in the Pecan Hollow Golf Course. Site A1 consists of stabilization of approximately 315 LF of the eroded north bank near the golf course cart path. Site A2 consists of stabilization of approximately 220 LF of the eroded south bank near the golf course green. The location of this project is Pecan Hollow Golf Course, 4501 14th Street in ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Plano |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
