Pecan Prairie Solar - 450 MW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
To be build in two phases. First phase will be 150 megawatts. 450 megawatt facility across 1,300 acres in the southwestern part of Leon County, enough energy to power over 50,000 homes
- Status
- Prospective
- Sector
- Solar, Residential, Raw Materials, Commercial, Power Generation (CCGT)
- Location
- Ridge, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pecan Prairie Solar - 450 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To be build in two phases. First phase will be 150 megawatts. 450 megawatt facility across 1,300 acres in the southwestern part of Leon County, enough energy to power over 50,000 homes |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Ridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Residential, Raw Materials, Commercial, Power Generation (CCGT) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
