PECO Install Fiber Optic From HQ to VC
Sector: Broadband • Location: Pecos, New Mexico, United States of America
Source: Dodge
The project involves the installation of approximately 600 meters of buried conduit, 600 meters of Single Mode 9/125, loose tube, gel filled, 6 Strand Fiber Optic cable and up to 12 vaults connect the Headquarters Building with the Visitor Center and repair the break in fiber optics located at the Entrance. The goal is to ensure reliable and high-quality telecommunications service while adhering t
- Status
- Closed
- Sector
- Broadband, Commercial, Manufacturing (Industrial), Telecommunications
- Location
- Pecos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PECO Install Fiber Optic From HQ to VC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the installation of approximately 600 meters of buried conduit, 600 meters of Single Mode 9/125, loose tube, gel filled, 6 Strand Fiber Optic cable and up to 12 vaults connect the Headquarters Building with the Visitor Center and repair the break in fiber optics located at the Entrance. The goal is to ensure reliable and high-quality telecommunications service while adhering to safety, environmental, and regulatory standards and not impacting the sensitive cultural resour... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Pecos |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Broadband, Commercial, Manufacturing (Industrial), Telecommunications |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
