logo

Pecos West Energy Transmission Project

Sector: Power Generation (CCGT) • Location: El Paso, Texas, United States

Source: KFOX

Project
Planned

The Pecos West project is a proposed high-voltage direct current (HVDC) transmission line connecting El Paso, Texas to southeastern New Mexico. Developed by Grid United, the project aims to link the Western and Eastern U.S. electric grid interconnections, allowing electricity to move bidirectionally between regions. It is described as a multi-billion-dollar infrastructure investment intended to st

Project Information FAQ

Project Information

3 Q
The project “Pecos West Energy Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in El Paso, Texas, United States. Taiyo aggregates data on it from KFOX.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Pecos West project is a proposed high-voltage direct current (HVDC) transmission line connecting El Paso, Texas to southeastern New Mexico. Developed by Grid United, the project aims to link the Western and Eastern U.S. electric grid interconnections, allowing electricity to move bidirectionally between regions. It is described as a multi-billion-dollar infrastructure investment intended to strengthen energy reliability, expand power market access, and prevent outages during extreme weather. The project is currently in the planning and development phase, with no final route approved. Construction will begin after regulatory approvals and land agreements are secured, with landowner participation being voluntary. The project is estimated to become operational in the mid-2030s if approved.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data