logo
ProjectClosed

Pedestrian and Cycling Bridges: Chief Peguis Trail

The status, timeline and source of this project. A free account opens every field.

Source: Manitoba

This project would widen the existing deck on the Kildonan Settlers Bridge (Bridge) and relocate existing traffic barriers on the south side of the Bridge to current accessibility standards that will accommodate pedestrians and cyclists. The project would connect the recently constructed Chief Peguis Trail Greenway, which was partially funded federally, to the North Winnipeg Parkway which connects

Status
Closed
Sector
Bridge, Car parking, Residential, Road, Mass Transit, Government, Automotive
Location
Canada
Updated
22 Jul 2026
Source
Manitoba

ConstructChat

Ask ConstructChat about Pedestrian and Cycling Bridges: Chief Peguis Trail

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pedestrian and Cycling Bridges: Chief Peguis Trail” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Manitoba.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project would widen the existing deck on the Kildonan Settlers Bridge (Bridge) and relocate existing traffic barriers on the south side of the Bridge to current accessibility standards that will accommodate pedestrians and cyclists. The project would connect the recently constructed Chief Peguis Trail Greenway, which was partially funded federally, to the North Winnipeg Parkway which connects to the Forks, closing a gap between these two prominent Winnipeg active transportation facilities. The project provides increased flexibility for people to access more transit routes and reduces people’s trip time through trip chaining (i.e., stops on the way to a destination). Chief Peguis Trail connects two major north-south transit corridors on Main and Henderson (Route 77). Upgrading existing pedestrian facilities to current accessibility standards and providing dedicated bicycle facilities between Main and Henderson will enable people to walk or ride their bikes to either Main or Henderson and access the proposed transit bike locker system or attach their bike to the bus. This improved walking/cycling connection will also connect to future Park and Ride locations at both Main and Henderson intersections at Chief Peguis. The proposed corridor improvement area is adjacent to high density residential land use, with a high percentage of seniors who rely on transit for their main source of transportation.

Budget

Location

Country

Canada

Source

Source reliability

High

Source

Manitoba

More Details

Record type

Project

Sector

Bridge, Car parking, Residential, Road, Mass Transit, Government, Automotive

Article published date

2023-11-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project