logo
ProjectBidding

Pedestrian Bridge and Utilities Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

In accordance with the Contract Plans and Specifications, the Project consists of the removal and replacement of an irrigation line and pedestrian bridge which spans the Truckee River. The new pedestrian bridge will involve concrete work to install new ADA facilities on either side of the river as well as to form and pour new abutments and wing walls. The project includes the installation of bridg

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Bridge, Cement, Government
Location
Reno, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pedestrian Bridge and Utilities Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pedestrian Bridge and Utilities Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Reno, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In accordance with the Contract Plans and Specifications, the Project consists of the removal and replacement of an irrigation line and pedestrian bridge which spans the Truckee River. The new pedestrian bridge will involve concrete work to install new ADA facilities on either side of the river as well as to form and pour new abutments and wing walls. The project includes the installation of bridge lighting, and corresponding electrical work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Reno

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Bridge, Cement, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project