logo

Pedestrian Bridge Replacement at Park at Bothell Landing

Sector: Bridge • Location: Bothell, Washington, United States of America

Source: City of Bothell

Project
Closed

The new bridge officially opened in July of 2021., This project replaced the pedestrian bridge over the Sammamish River at the Park at Bothell Landing. The project constructed a wider timber-truss bridge with a 12-foot wide deck that meets current structural and Americans with Disabilities Act (ADA) standards., The flatter deck and approach grades provide a fully accessible shared-use, non-motoriz

Project Information FAQ

Project Information

4 Q
The project “Pedestrian Bridge Replacement at Park at Bothell Landing” is an infrastructure initiative in the Bridge sector, located in Bothell, Washington, United States of America. Taiyo aggregates data on it from City of Bothell.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new bridge officially opened in July of 2021., This project replaced the pedestrian bridge over the Sammamish River at the Park at Bothell Landing. The project constructed a wider timber-truss bridge with a 12-foot wide deck that meets current structural and Americans with Disabilities Act (ADA) standards., The flatter deck and approach grades provide a fully accessible shared-use, non-motorized path for bicyclists and pedestrians. The design maintains the arched look of the City's iconic bridge, The project strengthens and enhances Bothell's network of bike and pedestrian facilities and aligns with the Park Master Plan., The City received the following grants for the design & construction of this project: $1,175,000 Federal Congestion Mitigation and Air Quality Improvement (CMAQ) Grant, $1,080,300 State Recreation and Conservation Office's Washington Wildlife and Recreation Program (WWRP) trails grant.,

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data