logo

Pedestrian Bridge Replacement

Sector: Bridge • Location: Newmarket, Ontario, Canada

Source: Dodge

Project
Closed

BREIF DESCRIPTION OF WORK: The Deliverables include, but are not limited to, construction of a new pedestrian bridge with a minimum load capacity of 30,000 lbs. and the removal and disposal of the existing bridge. For complete bid details, refer to the RFT documents.

Status
Closed
Sector
Bridge, Government, Road, Commercial
Location
Newmarket, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pedestrian Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pedestrian Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Newmarket, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BREIF DESCRIPTION OF WORK: The Deliverables include, but are not limited to, construction of a new pedestrian bridge with a minimum load capacity of 30,000 lbs. and the removal and disposal of the existing bridge. For complete bid details, refer to the RFT documents.

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Newmarket

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Government, Road, Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project