Pedestrian Focus Area 14b Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Various pedestrian safety elements, including new crosswalk markings, ADA ramps, RRFB, bumpouts, refuge medians, and signage, in the Irvington and Christian Park neighborhood areas Various pedestrian safety elements, including new crosswalk markings, ADA ramps, RRFB, bumpouts, refuge medians, and signage, in the Irvington and Christian Park neighborhood areas
- Status
- Closed
- Sector
- Road, Commercial, Car parking, Automotive
- Location
- Indianapolis, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pedestrian Focus Area 14b Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Various pedestrian safety elements, including new crosswalk markings, ADA ramps, RRFB, bumpouts, refuge medians, and signage, in the Irvington and Christian Park neighborhood areas Various pedestrian safety elements, including new crosswalk markings, ADA ramps, RRFB, bumpouts, refuge medians, and signage, in the Irvington and Christian Park neighborhood areas |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Indianapolis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Car parking, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
