Pedestrian Improvement Project
Sector: Car parking • Location: New Milford, Connecticut, United States of America
Source: Dodge USA
Rt 7/Aspetuck Ave. Pedestrian Improvement Project Engineering & Inspection Services for Sidewalk Construction Project - Route 7 & Aspetuck Avenue. This project proposes to connect New Milford High School with an approved sidewalk and connect existing sidewalks installed along Route 7/Danbury Road and proposes to fill in the gaps or extend the sidewalk network. The sidewalk segments proposed shall
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- New Milford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pedestrian Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rt 7/Aspetuck Ave. Pedestrian Improvement Project Engineering & Inspection Services for Sidewalk Construction Project - Route 7 & Aspetuck Avenue. This project proposes to connect New Milford High School with an approved sidewalk and connect existing sidewalks installed along Route 7/Danbury Road and proposes to fill in the gaps or extend the sidewalk network. The sidewalk segments proposed shall close various gaps from Pickett District Road to Still River Drive and on Aspetuck Avenue from Su... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New Milford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
