Pedestrian Path Improvements
Sector: Mass Transit • Location: Bakersfield, California, United States of America
Source: Dodge USA
The work to be performed consists, in general, of the construction of multi-use paths, sidewalks, curbs, gutters, curb ramps, drive approaches, paving hot mix asphalt , applying thermoplastic pavement markings, reconstructing fences, installing signs and of flashing beacons, and sump regrading.
- Status
- Closed
- Sector
- Mass Transit, Road, Car parking, Rail, Commercial, Automotive, Government
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pedestrian Path Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed consists, in general, of the construction of multi-use paths, sidewalks, curbs, gutters, curb ramps, drive approaches, paving hot mix asphalt , applying thermoplastic pavement markings, reconstructing fences, installing signs and of flashing beacons, and sump regrading. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Car parking, Rail, Commercial, Automotive, Government |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
