Pedestrian Path Lighting Along Arrow Drive
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work shall consist essentially of the following items: Installation of electrical conduit, wiring, bollard lighting, electrical service, etc. for pedestrian path lighting along Arrow Drive and Traceway Park. All other related items of work required to complete the project as shown and specified in the Contract Documents.
- Status
- Closed
- Sector
- Government, Commercial, Car parking, Power Generation (CCGT), Road, Automotive
- Location
- Clinton, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pedestrian Path Lighting Along Arrow Drive
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist essentially of the following items: Installation of electrical conduit, wiring, bollard lighting, electrical service, etc. for pedestrian path lighting along Arrow Drive and Traceway Park. All other related items of work required to complete the project as shown and specified in the Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Car parking, Power Generation (CCGT), Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
