Pedestrian Ramp Replacement
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
In general, the work consists of: Replacing an existing concrete pedestrian ramp and stairs at the main building entrance and replacing existing metal handrails at the loading dock stairs. Work includes demolition, new concrete structure, new metal railings, and asphalt pavement restoration.
- Status
- Closed
- Sector
- Commercial, Metal, Cement, Rail, Road, Car parking, Automotive, Government
- Location
- Whitewater, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pedestrian Ramp Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of: Replacing an existing concrete pedestrian ramp and stairs at the main building entrance and replacing existing metal handrails at the loading dock stairs. Work includes demolition, new concrete structure, new metal railings, and asphalt pavement restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Whitewater |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Cement, Rail, Road, Car parking, Automotive, Government |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
