logo

Pedra do Sal Wind Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

Sea West do Brasil Ltda was granted an authorization to build a 18-MW wind power plant located in the state of Piauí (municipality of Parnaíba). The company signed a 30-year contract with the regulatory agency ANEEL to build, own and operate the facility in October 2002. In April 2008, the authorization was transferred to Econergy Pedra do Sal S.A., a subsidiary of Econergy International. In Octob

Status
Prospective
Sector
Commercial, Wind, Government, Power Generation (CCGT)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pedra do Sal Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pedra do Sal Wind Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sea West do Brasil Ltda was granted an authorization to build a 18-MW wind power plant located in the state of Piauí (municipality of Parnaíba). The company signed a 30-year contract with the regulatory agency ANEEL to build, own and operate the facility in October 2002. In April 2008, the authorization was transferred to Econergy Pedra do Sal S.A., a subsidiary of Econergy International. In October of the same year, Tractebel acquired the authorization and established the special purpose entity Eolica Pedra do Sal S.A. to manage the project. The investment on the project amounted to US$ 56.2 million (BRL 102.8 million). Construction works started in August 2008, and the power plant commenced operations in February 2009. In 2009, a US$ 36 million (BRL 72 million) loan was granted from the state-owned bank BNDES. This funding was set to be used in the expansion of the power plant to a 30 MW capacity, representing an investment of US$ 51.8 million (BRL 103.6 million). The construction works on this new phase was expected to be concluded by the end of 2010. Eolica Pedra do Sal S.A. signed power purchase agreements arranged with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies).

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Government, Power Generation (CCGT)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project