logo

Pelican Renewable Generating Station

Sector: Water Supply and Storage • Location: Fort Mcmurray, Alberta, Canada

Source: Dodge USA

Project
Delayed

Construction and operation of a run-of river hydroelectric facility onthe Athabasca River located approximately 180 kilometres upstream of Fort McMurray with generating capacity of 135 megawatts - Components would include a new 240 kilovolt transmission line and a spillway to increase the water level in the river and a powerhouse and in-river embankment structures and boat launches and access road

Status
Failure
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial
Location
Fort Mcmurray, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pelican Renewable Generating Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pelican Renewable Generating Station” is an infrastructure initiative in the Water Supply and Storage sector, located in Fort Mcmurray, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction and operation of a run-of river hydroelectric facility onthe Athabasca River located approximately 180 kilometres upstream of Fort McMurray with generating capacity of 135 megawatts - Components would include a new 240 kilovolt transmission line and a spillway to increase the water level in the river and a powerhouse and in-river embankment structures and boat launches and access roads and ramp fishways

Budget

Location

Country

Canada

State

Alberta

City

Fort Mcmurray

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project