Pelion High School Stadium Field Drainage Improvements
Sector: Raw Materials • Location: Pelion, South Carolina, United States of America
Source: Dodge USA
Improve drainage of the Pelion High School football field on the visitor s side from middle of field to sideline in line with the catch basins. -Cut sod where drain lines are to be installed and pack with masonry sand -Dig ditch lines and install 6 multi-flow drain lines on a downward slope from 50 yd line toward each 20 yd line. The lines are to be installed 4 apart resulting in about 18 lines on
- Status
- Closed
- Sector
- Raw Materials, Stadium, Cement, Car parking, Government, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Commercial
- Location
- Pelion, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pelion High School Stadium Field Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Improve drainage of the Pelion High School football field on the visitor s side from middle of field to sideline in line with the catch basins. -Cut sod where drain lines are to be installed and pack with masonry sand -Dig ditch lines and install 6 multi-flow drain lines on a downward slope from 50 yd line toward each 20 yd line. The lines are to be installed 4 apart resulting in about 18 lines on each side. -Attach the two main drain lines to the existing catch basins on visitor side -Resod ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Pelion |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Stadium, Cement, Car parking, Government, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
