Pemex Miguel Hidalgo Refinery

Sector: Advanced Electronics • Location: World

Source: Hydrocarbon Technology

Project
Closed

The Miguel Hidalgo refinery is located in Tula in the Hidalgo state of Mexico. Located about 150km from Mexico City, the refinery is owned and operated by Mexican oil company Pemex. The refinery was built in March 1976 and put into operation in 1977. The initial processing capacity of the refinery was 150,000 barrels per day (bpd). The refinery currently has a processing capacity of 320,000bp

Project Information FAQ

Project Information

4 Q
The project “Pemex Miguel Hidalgo Refinery” is an infrastructure initiative in the Advanced Electronics sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Miguel Hidalgo refinery is located in Tula in the Hidalgo state of Mexico. Located about 150km from Mexico City, the refinery is owned and operated by Mexican oil company Pemex. The refinery was built in March 1976 and put into operation in 1977. The initial processing capacity of the refinery was 150,000 barrels per day (bpd). The refinery currently has a processing capacity of 320,000bpd. It supplies motor fuels to various states of Mexico including Hidalgo, Morelos, Queretaro, Celaya and Guerrero. In March 2010, Pemex awarded an $800m contract to Saipem to construct a desulphurisation unit and an amine regeneration unit at the refinery. The contract also includes construction of similar units at Pemex’s Antonio M. Amor refinery in Salamanca, Mexico. The scope of work for Saipem includes engineering, procurement and construction (EPC) of the two units. Saipem will be responsible for commissioning and testing the units. The company will also construct related auxiliary systems at the refinery. The two units are expected to be completed in 38 months. The two units are being constructed to reduce sulphur content of the gasoline produced at the refinery. Sulphur content in gasoline needs to be reduced to meet Mexican environmental regulations and also mitigate harmful emissions. In 1994, the refinery’s Methyl tert-butyl ether (MTBE), tertiary amyl methyl ether (TAME) and catalytic units became operational. In 1995, Fagioli PSC was contracted to erect four heavy oil reactors at the refinery. Each reactor weighed 1,310t and was 45m long with a diameter of 6m. Scope of work for Fagioli included raising the reactors vertically, rotating them through 1800 and placing them over their foundations. Fagioli used 6m high Tower Lift supports, a pair of 23m long box beams and L600 lifting jacks to perform the lift operations. The L600 lifting jacks were supported by a traversing carriage which was, in turn, supported by 16 Hillman Rollers. The reactor top lifting lugs were connected to a 350mm diameter steel pin, which helped the lifting jacks lift them into position. The four reactors were placed into position in 10 days. The heavy wastes unit (H-Oil) of the refinery became operational in 1999. In 2007, Pemex launched a programme to cut 49,000t/y of greenhouse gas emissions from the boilers of the refinery. The company signed an agreement to trade carbon credits for emissions with Carbon Solutions, an environmental consulting company. In October 2003, Emerson Process Management, a unit of Emerson, was awarded a $3.9m contract for automating the alkylation plant of the refinery. Emerson used its PlantWeb architecture to automate the alkylation plant. The plant produces high-octane gasoline at the refinery. The PlantWeb technology was selected due to its easy configuration and ability to provide better plant availability. By installing the technology, Pemex was able to provide authorised personnel access to a range of information regardless of their physical location. The personnel can access real-time information about various devices and equipment installed at the refinery. The PlantWeb technology also includes a DeltaV digital automation system and AMS Suite predictive maintenance software. The technology communicates with field devices installed at the refinery through the Foundation fieldbus technology. ABB Automation won a contract in October 2000 to supply control and instrumentation systems to the refinery. The $4.2m contract was part of a refinery modernisation programme. ABB modernised the control system, process analysers and field instrumentation of the refinery under the contract. The new systems are used for data acquisition and control. ECIS Group was responsible for the procurement of purging and flushing systems and other bulk materials. Hanol Technology provided heat transfer design services for the refinery in 2000. AICO Corporation provided inspection and technical services for the refinery between September 2000 and December 2001.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data