logo

Penang Toll Bridge

Sector: Water Supply and Storage • Location: Penang, Malaysia

Source: World Bank Group

Project
Cancelled

Penang Bridge Sdn Bhd (PBSB) was the wholly owned subsidiary of UEM Builders as of 2005. It was a single-purpose company with the sole purpose of undertaking the operations, maintenance, tolling and improvement works on the Penang Bridge.

From September 1985 to September 1993, operation and management of the Penang Bridge was managed by Malaysian Highway Authority (MHA). The Malaysian Govern

Project Information FAQ

Project Information

5 Q
The project “Penang Toll Bridge” is an infrastructure initiative in the Water Supply and Storage sector, located in Penang, Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Penang Bridge Sdn Bhd (PBSB) was the wholly owned subsidiary of UEM Builders as of 2005. It was a single-purpose company with the sole purpose of undertaking the operations, maintenance, tolling and improvement works on the Penang Bridge. From September 1985 to September 1993, operation and management of the Penang Bridge was managed by Malaysian Highway Authority (MHA). The Malaysian Government and Mekar Idaman Sdn Bhd (an associate of UEM) entered into a Concession Agreement dated 30 September 1993 in connection with managing, maintaining and operating toll collection services of the Penang Bridge for a concession period of 25 years until 31 May 2018. The consideration of RM550.0 million (US $216 million) to the government was financed by a syndicated term loan issued by Mekar Idaman Sdn Bhd and arranged by RHB Sakura Merchant Bankers Berhad. On 23 November 1995, Penang Bridge Sdn Bhd, ("PBSB") (a wholly-owned subsidiary of UEM Builders Berhad ("UEM Builders")), and Mekar Idaman Sdn Bhd entered into a Novation Agreement with the Government whereby, with the approval of the Government, Mekar Idaman Sdn Bhd assigned its rights and transferred its liabilities and obligations under the Concession Agreement to PBSB. The Bridge was built by the Government at a total cost of RM800.00 million (excluding the cost of land acquisition). With 3 interchanges, the 13.5 km Penang Bridge of which 8.4 km was above water was officially open to public on 14 September 1985. It had 533 spans of which 192 spans for the Bridge was above water. Constructed with a 6.2 km dual carriageway and 2.2 km three lanes at the Main span, this Bridge was the only physical link between the Mainland of Peninsular Malaysia and Penang Island. http://www.penangbridge.com.my/ http://www.uembuilders.com/uembb_group.php

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data