Penang underground tunnel link concession
One of 10,000+ projects Taiyo tracks in Malaysia.
Source: InfraPPPWorld
The projects involve a 4.2km Gurney Drive-Tun Dr Lim Chong Eu expressway, a 4.6km Tun Dr Lim Chong Eu-Bandar Baru Air Itam bypass (four lanes), a 6.5km Penang-Butterworth Tunnel and a 12km road connecting Tanjung Bungah and Teluk Bahang (four lanes).The concession for the third-link, the underground tunnel, agreed upon is for 30 years and the toll rate must be the same rate as the Second Penang Br
- Status
- Under Construction
- Sector
- Tunnel, Road
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Penang underground tunnel link concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The projects involve a 4.2km Gurney Drive-Tun Dr Lim Chong Eu expressway, a 4.6km Tun Dr Lim Chong Eu-Bandar Baru Air Itam bypass (four lanes), a 6.5km Penang-Butterworth Tunnel and a 12km road connecting Tanjung Bungah and Teluk Bahang (four lanes).The concession for the third-link, the underground tunnel, agreed upon is for 30 years and the toll rate must be the same rate as the Second Penang Bridge.The contract includes a land swap as well. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Malaysia |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Tunnel, Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project