Pench Diversion Project
One of 6,542 projects Taiyo tracks in Madhya Pradesh.
Source: India Investment Grid (IIG)
Information Water Resources-MP has come up with Pench Diversion Project with a ticket size of 1564.79 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 20
- Status
- Closed
- Sector
- Cement, Hydro, Water Supply and Storage, Road, Government
- Location
- chhindwara, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Pench Diversion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Water Resources-MP has come up with Pench Diversion Project with a ticket size of 1564.79 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. The Pench Diversion Project [Major] envisages construction of a composite dam in Distt. Chhindwara across river Pench, a tributary of river Kanhan, which in turn, is a tributary of river Wainganga in Godavari Basin. The project envisages construction of the following main works- ?. 42 m high and 5970 m long earthen and 360 long concrete dam comprising 140 m long ogee type spillway. ?. The spillway with crest level of 609.75 m would pass PMF of a tune of 12411 cumecs through 08 Nos. of radial crest gates of size 14.00 m x 16.00 m each. ?. A 30.20 km long Right bank main canal & 20.07 km long Left bank main canal. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 335.208 crore Eligible Central Assistance was Rs 25.99 crore CA released since 2016 till October 2021- 15.48 crore State Share released through NABARD under LTIF till October 2021- Rs Nil Physical progress- 99.04 percentage Financial Progress- 93.71 percentage Ultimate Irrigation Potential is 28270 Ha Irrigation Potential created till October 2021- 25270 Ha Projected Date of Completion- March 2022 |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | chhindwara |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Cement, Hydro, Water Supply and Storage, Road, Government |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Luhri StageI Hydroelectric Project Himachal Pradesh India
- Lower Subansiri Hydroelectric Power Project
