logo

Pench Diversion Project

Sector: Cement • Location: chhindwara, Madhya Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Water Resources-MP has come up with Pench Diversion Project with a ticket size of 1564.79 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 20

Project Information FAQ

Project Information

5 Q
The project “Pench Diversion Project” is an infrastructure initiative in the Cement sector, located in chhindwara, Madhya Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Water Resources-MP has come up with Pench Diversion Project with a ticket size of 1564.79 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. The Pench Diversion Project [Major] envisages construction of a composite dam in Distt. Chhindwara across river Pench, a tributary of river Kanhan, which in turn, is a tributary of river Wainganga in Godavari Basin. The project envisages construction of the following main works- ?. 42 m high and 5970 m long earthen and 360 long concrete dam comprising 140 m long ogee type spillway. ?. The spillway with crest level of 609.75 m would pass PMF of a tune of 12411 cumecs through 08 Nos. of radial crest gates of size 14.00 m x 16.00 m each. ?. A 30.20 km long Right bank main canal & 20.07 km long Left bank main canal. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 335.208 crore Eligible Central Assistance was Rs 25.99 crore CA released since 2016 till October 2021- 15.48 crore State Share released through NABARD under LTIF till October 2021- Rs Nil Physical progress- 99.04 percentage Financial Progress- 93.71 percentage Ultimate Irrigation Potential is 28270 Ha Irrigation Potential created till October 2021- 25270 Ha Projected Date of Completion- March 2022

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data