Pendleton Signal Upgrade
Sector: Steel • Location: Pendleton, Oregon, United States of America (USA)
Source: Oregon Department of Transportation
Replace decaying wood signal poles with steel poles to reduce risk of failure and upgrade the ADA ramps for pedestrian safety
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replace decaying wood signal poles with steel poles to reduce risk of failure and upgrade the ADA ramps for pedestrian safety |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Steel projects in United States of America (USA)
- CNG Fueling at Hamilton Bus Facility
- AMLI Lofts
- McCarran International Airport – New ATCT and TRACON
- Oakland Harbor Turning Basins Widening
- Storey Residence Expansion
- Shoreline Substantial Development application to remove existing dock and replace with new dock. Project include 14 new steel piles and 1 new mooring pile.
- EDG - Interior Remodel of existing 7-story building in University District, zoned Mixed Use. Originally constructed 1928, steel frame with brick exterior type III-A, Occupancy is R-2, M, B. Area is 14,834 s.f.
- Shoreline Substantial Development application to allow a new residential boat lift and dock repair. Existing float, decking and 2 steel mooring piles to be demolished. 2 existing piles to be repaired.
