Peninsula Link Project

Sector: Automotive • Location: Australia

Source: Road Traffic Technology

Project
Closed

Construction of the Lathams road in progress for the Peninsula Link Project. A highflow channel was constructed on the Lathams road. The link road passes through Pines Flora and Fauna Reserve and the Westerfield property. The Peninsula Link is a 27km-long, four-lane road connecting the Mornington Peninsula Freeway in Mount Martha to the EastLink in Carrum Downs, Australia. It is the first road pro

Project Information FAQ

Project Information

4 Q
The project “Peninsula Link Project” is an infrastructure initiative in the Automotive sector, located in Australia. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of the Lathams road in progress for the Peninsula Link Project. A highflow channel was constructed on the Lathams road. The link road passes through Pines Flora and Fauna Reserve and the Westerfield property. The Peninsula Link is a 27km-long, four-lane road connecting the Mornington Peninsula Freeway in Mount Martha to the EastLink in Carrum Downs, Australia. It is the first road project built under a 25-year public-private-partnership in the country. The construction of the project began in February 2010 and was completed in January 2013. The new roadway reduced the journey time from Carrum Downs to Mount Martha by almost 40min to 17min. The freeway project attracted an $849m investment. The Peninsula Link, also known as the Frankston Bypass, was constructed as a part of $38bn Victorian Transport Plan. The plan was initiated in 2008 in an attempt to improve the transportation system in the state of Victoria. The link road helps the state’s economic growth and reduces congestion. During the project’s three-year construction period, 4,000 jobs were created. The equity needed for the project was arranged by Bilfinger Berger Project Investments and Access Capital Clients. Southern Way was responsible for providing debt finance through financiers including Royal Bank of Scotland, ANZ and National Australia Bank, Banco Bilbao Vizraya Argentaria, Banco Santander, Bank of Ireland, Sumitomo Mitsui Banking Corporation, WestLB and Bank of Tokyo-Mitsubishi. The project has proven controversial with many politicians and local people argued that the project will not solve the congestion on the Frankston Freeway – Cranbourne Road intersection. They also felt that the there is no need to construct the road as the city’s population was not growing at a rapid pace. Environmentalists have also been outspoken about the road, which passes through Pines Flora and Fauna Reserve and the Westerfield property. They feared that endangered and indigenous species will not be protected. In February 2010, protestors demonstrated against the project outside of Parliament House. They stated that the road will ruin the biodiversity in the Carrum Downs wetlands, the Belvedere Reserve woodlands, the Pobblebonk wetland reserve, the Wittenberg reserve, the Westerfield heritage woodlands, and the Pines Flora and Fauna Reserve. The Southern Way consortium, comprising Abigroup, Bilfinger Berger and the Royal Bank of Scotland, was responsible for designing, building and financing the link road project. The road is operated and maintained by Bilfinger Berger Services for 25 years. At the end of the contract, the road will be delivered to Linking Melbourne Authority through Partnerships Victoria framework. The framework has been created by the Victorian Government for expanding and improving public infrastructure through public-private-partnership contracts. Aurecon‐SKM Design joint venture was subcontracted by Abigroup to provide design consultancy services. The status of the project was reviewed independently by Linking Melbourne Authority and Southern Way in association with AECOM. The project included the construction of 11 local road connections, a 22km-long cycling and walking path, and 35 bridges. A roadside control centre and fauna crossing underpath were also built. Around 1.5 million plants were planted along the freeway corridor. The link road consists of two lanes in each direction. Local road connections were constructed at the EastLink/Mornington Peninsula Freeway, Dandenong-Frankston Road, Skye Road, Cranbourne Road, Golf Links Road, Frankston-Flinders Road, Bungower Road, Mornington-Tyabb Road and Mornington Peninsula freeway in Mount Martha. The route has a common cycling and walking path that is the largest shared use path after the EastLink trail. The 3m-wide path starts from the City of Kingston and links to other popular paths. Construction work on the $9.4m Lathams Road overpass in Carrum Downs has been fast-tracked and was finished in early 2011. The overpass allows the vehicles used for construction to directly access the Peninsula Link project site. Noise walls and mounds were constructed to limit the traffic noise level below VicRoads Traffic Noise Reduction Policy standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data