logo
ProjectClosed

Penitentiary Warehouse / Buro NØRD Architectuur

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The work building consists of three zones; expedition, (grocery) shop and supporting / supervision facilities. In order to make the flexibility and adaptivity capacity of the building as great as possible, the construction consists of trusses with a large span within which the space can be freely divided. Facades and interior walls are not load-bearing and can be modified quite easily. Stability o

Status
Closed
Sector
Cement, Warehouse, Residential, Commercial
Location
Netherlands
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Penitentiary Warehouse / Buro NØRD Architectuur

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Penitentiary Warehouse / Buro NØRD Architectuur” is an infrastructure initiative in the Cement sector, located in The Netherlands. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work building consists of three zones; expedition, (grocery) shop and supporting / supervision facilities. In order to make the flexibility and adaptivity capacity of the building as great as possible, the construction consists of trusses with a large span within which the space can be freely divided. Facades and interior walls are not load-bearing and can be modified quite easily. Stability of the construction is generated by cross-braces in two directions between the columns. On the side of the expedition areas, the trusses form a canopy with a generous overhang under which loading and unloading can take place in a dry and sheltered environment.Text description provided by the architects.The store is one of the labor facilities in the penitentiary complex. This building takes a special place within the penitentiary regime. It is a social environment where inmates can earn some extra money and gain work experience. Important considering their resocialization after serving their sentence.Sustainability and circularity have become a fundamental pillar in the justice housing policy in recent years. The construction of the store consists of columns and trusses made of CLT wood. The facades are made of untreated thermally modified wood and polycarbonate cladding. The plinth is made of prefabricated epoxy concrete elements.The structure, facade and roof can be completely dismantled, so that the store can be moved to another location in the complex (or outside) over time.Focus point in the design is to contribute to the inmates' perspective on life outside the walls. By turning the store into a spacious, light and comfortable space in which all security components are (invisible) integrated into the design as carefully as possible. The use of warm, robust materials has created a working environment that can withstand a knock or two, but with a comfortable appearance.

Location

Country

Netherlands

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Cement, Warehouse, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project