logo
ProjectPre-Construction

Penticton - Community Recreation Centre Energy Optimization

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The proposed project at the existing Penticton Community Recreation Centre will upgrade HVAC equipment and heat recovery, and will improve pool heat retention. The project will reduce natural gas and water use, reduce the facility’s greenhouse gas emissions by up to 60%, and improve occupant comfort. The project works will include: - air-source heat pumps; - water-source heat pump to preheat domes

Status
Prospective
Sector
Water Supply and Storage, Natural Gas, Commercial, Government
Location
British Columbia, Canada
Updated
19 Nov 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Penticton - Community Recreation Centre Energy Optimization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Penticton - Community Recreation Centre Energy Optimization” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed project at the existing Penticton Community Recreation Centre will upgrade HVAC equipment and heat recovery, and will improve pool heat retention. The project will reduce natural gas and water use, reduce the facility’s greenhouse gas emissions by up to 60%, and improve occupant comfort. The project works will include: - air-source heat pumps; - water-source heat pump to preheat domestic hot water; - replace domestic water heaters with high-efficiency condensing units; - repurpose existing heat-recovery coils for outdoor air preheating; - addition of additive to improve boiler loop efficiency; - liquid pool cover; - low-flow water fixtures; and - mechanical, electrical, control/monitoring, signage, and other related works and appurtenances.

Original sector

Green Energy

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Natural Gas, Commercial, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project