Penticton - Ellis #4 Dam Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The City of Penticton is located in the Okanagan Valley in the Southern Interior of British Columbia with a population of 34,000. Ellis #4 Dam is situated at the head of the north fork of Ellis Creek, approximately 16 km from Penticton. The existing embankment dam is approximately 10 m in height and about 550 m in length. Discharge infrastructure at the dam includes a low-level outlet and a concre
- Status
- Closed
- Sector
- Cement, Hydro, Manufacturing (Industrial), LNG, Commercial, Water Supply and Storage, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Penticton - Ellis 4 Dam Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Penticton is located in the Okanagan Valley in the Southern Interior of British Columbia with a population of 34,000. Ellis #4 Dam is situated at the head of the north fork of Ellis Creek, approximately 16 km from Penticton. The existing embankment dam is approximately 10 m in height and about 550 m in length. Discharge infrastructure at the dam includes a low-level outlet and a concrete spillway near the right abutment. Assessments of the dam have identified deficiencies in the structure’s ability to safely pass design flows as well as structural stability issues. The purpose of the Ellis #4 project is to rehabilitate the existing dam to mitigate the potential for dam failure resulting from more extreme weather events resulting from climate change and other natural disasters in turn mitigating downstream flood risks as well as satisfying CDA Guidelines and BC Dam Safety Regulations. The consequences of dam failure are considered extreme and the rehabilitation will protect human life as well as industrial and commercial properties downstream within the City. The rehabilitation of the dam will involve: Installation of a gabion armoured spillway to supplement the existing concrete spillway and increase overall discharge capacity, Stabilization of the structure through the removal and replacement of liquefaction susceptible fill over ±180m of the dam, Replacement of the low-level outlet structure. Replacement of the debris boom |
Original sector | Climate Resilience |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Cement, Hydro, Manufacturing (Industrial), LNG, Commercial, Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
- Kearl Ore Preparation Plant
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- McMath Secondary School
