logo
ProjectCompleted

Penticton - Ellis #4 Dam Upgrade

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The City of Penticton is located in the Okanagan Valley in the Southern Interior of British Columbia with a population of 34,000. Ellis #4 Dam is situated at the head of the north fork of Ellis Creek, approximately 16 km from Penticton. The existing embankment dam is approximately 10 m in height and about 550 m in length. Discharge infrastructure at the dam includes a low-level outlet and a concre

Status
Closed
Sector
Cement, Hydro, Manufacturing (Industrial), LNG, Commercial, Water Supply and Storage, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Penticton - Ellis 4 Dam Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Penticton - Ellis 4 Dam Upgrade” is an infrastructure initiative in the Cement sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Penticton is located in the Okanagan Valley in the Southern Interior of British Columbia with a population of 34,000. Ellis #4 Dam is situated at the head of the north fork of Ellis Creek, approximately 16 km from Penticton. The existing embankment dam is approximately 10 m in height and about 550 m in length. Discharge infrastructure at the dam includes a low-level outlet and a concrete spillway near the right abutment. Assessments of the dam have identified deficiencies in the structure’s ability to safely pass design flows as well as structural stability issues. The purpose of the Ellis #4 project is to rehabilitate the existing dam to mitigate the potential for dam failure resulting from more extreme weather events resulting from climate change and other natural disasters in turn mitigating downstream flood risks as well as satisfying CDA Guidelines and BC Dam Safety Regulations. The consequences of dam failure are considered extreme and the rehabilitation will protect human life as well as industrial and commercial properties downstream within the City. The rehabilitation of the dam will involve: • Installation of a gabion armoured spillway to supplement the existing concrete spillway and increase overall discharge capacity, • Stabilization of the structure through the removal and replacement of liquefaction susceptible fill over ±180m of the dam, • Replacement of the low-level outlet structure. • Replacement of the debris boom

Original sector

Climate Resilience

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Hydro, Manufacturing (Industrial), LNG, Commercial, Water Supply and Storage, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project