Peoria City Combined Sewer Overflow Improvements
Sector: Water Supply and Storage • Location: Peoria, Illinois, United States of America
Source: Dodge USA
The Year 4 green infrastructure project consists of permeable pavement, subsurface infiltration, and/or bioswales in the right-of-way to manage stormwater and reduce CSO discharges. The project will be located in the combined sewer area below the bluff in areas with higher infiltrating soils. Permeable paver blocks will be installed in parking lanes and bioswales and subsurface infiltration will b
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- Peoria, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Peoria City Combined Sewer Overflow Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Year 4 green infrastructure project consists of permeable pavement, subsurface infiltration, and/or bioswales in the right-of-way to manage stormwater and reduce CSO discharges. The project will be located in the combined sewer area below the bluff in areas with higher infiltrating soils. Permeable paver blocks will be installed in parking lanes and bioswales and subsurface infiltration will be installed at intersection approaches and/or behind the curb in parkway areas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Peoria |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
