Perak Photovoltaic Power Plant Project
The owner, status and timeline of this project. A free account opens every field.
Source: Safran
A photovoltaic power plant project in the state of Perak, Malaysia, expected to be commissioned in 2026. This project, along with the Kedah hydropower project, will generate at least 95 GWh of renewable energy annually to cover the majority of Safran Landing Systems site’s projected consumption via 21-year Virtual Power Purchase Agreements.
- Status
- Prospective
- Sector
- Solar, Hydro, Power Generation (CCGT)
- Location
- Perak, Malaysia
- Updated
- 22 Jul 2026
- Source
- Safran
ConstructChat
Ask ConstructChat about Perak Photovoltaic Power Plant Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A photovoltaic power plant project in the state of Perak, Malaysia, expected to be commissioned in 2026. This project, along with the Kedah hydropower project, will generate at least 95 GWh of renewable energy annually to cover the majority of Safran Landing Systems site’s projected consumption via 21-year Virtual Power Purchase Agreements. |
Original sector | Energy |
Location
Country | Malaysia |
State | Perak |
Source
Source | Safran |
URL |
More Details
Record type | Project |
Sector | Solar, Hydro, Power Generation (CCGT) |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
