Perdue Booster Station Upgrades
Sector: Water Supply and Storage • Location: Salisbury, Maryland, United States of America
Source: Dodge USA
The Perdue Water Booster Station, which boosts flow to the Eastern Service Area, Wor-Wic Tower and Airport was installed in 2005. The station will require an upgrade in safe capacity as flows increase and exceed the max day demand of 1.2 MGD. In addition, electrical equipment upgrades will be needed. The City of Salisbury may be seeking a consultant to prepare engineering services for Perdue Boost
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Perdue Water Booster Station, which boosts flow to the Eastern Service Area, Wor-Wic Tower and Airport was installed in 2005. The station will require an upgrade in safe capacity as flows increase and exceed the max day demand of 1.2 MGD. In addition, electrical equipment upgrades will be needed. The City of Salisbury may be seeking a consultant to prepare engineering services for Perdue Booster Station Upgrades Project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
