logo

Peregrine Lunar Lander

Sector: Advanced Electronics • Location: Thailand

Source: Aerospace Technology

Project
Closed

Peregrine lander will carry payload to moon as part of NASA’s Commercial Lunar Payload Services (CLPS) initiative. Image courtesy of Astrobotic Technology. The first Peregrine lander is planned to be launched in July 2021. Image courtesy of Astrobotic Technology. A total of 28 payloads will be carried to lunar surface by the Peregrine lander. Image courtesy of Astrobotic Technology. The Peregrine

Project Information FAQ

Project Information

4 Q
The project “Peregrine Lunar Lander” is an infrastructure initiative in the Advanced Electronics sector, located in Thailand. Taiyo aggregates data on it from Aerospace Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Peregrine lander will carry payload to moon as part of NASA’s Commercial Lunar Payload Services (CLPS) initiative. Image courtesy of Astrobotic Technology. The first Peregrine lander is planned to be launched in July 2021. Image courtesy of Astrobotic Technology. A total of 28 payloads will be carried to lunar surface by the Peregrine lander. Image courtesy of Astrobotic Technology. The Peregrine lunar lander is a payload delivery module being developed by Astrobotic Technology, a space robotics company based in the US. Peregrine will carry and deliver commercialpayload to lunar orbit and surface for clients, including companies, universities, governments, non-profit organisations and individuals. NASA awarded a $79.5m contract to Astrobotic for the delivery of 14 payloads to the Moon by the Peregrine lander in July 2021. The first mission of Peregrine will carry a total of 28 payloads from eight nations, including the US. NASA also shortlisted two other commercial Moon landing service providers along with Astrobotic for the delivery of payload under its Commercial Lunar Payload Services (CLPS) initiative, as part of the Artemis programme. Artemis is a NASA programme that aims to establish a sustainable human presence on the Moon by 2028. NASA, in collaboration with the US companies, started CLPS as part of the Artemis programme. NASA plans to launch the Gateway spaceship, which will orbit the Moon and act as a temporary office for the astronauts. The ultimate aim of the programme is to prepare for human presence on Mars. The lander structure is made of a lightweight aluminium alloy. It features four payload decks arranged in ortho-grid structure for easy integration of top-mounted payloads. A 1.2m launch vehicle adapter, a landing sensor, five main engines, four fuel tanks, solar panels, altitude control thrusters and landing gear form the major components of the lander. A cone assembly at the bottom of the lander will house engines and act as the coupling medium between the launch vehicle and the lander. The commercial lunar lander will be 1.9m-long and 2.5m-wide, with a total mass of 1,283kg, including the propellant and payload. The initial landers will have a nominal surface payload capacity of 35kg, which will be further increased to a maximum of 265kg. The Peregrine lander’s modular structure is configurable based on the mission requirements, payload types and delivery location. The landing legs are removed and vertical mounting panels are placed instead of the horizontal mounting deck, for missions confined to lunar orbit. The lander can be further modified to accommodate a satellite on the top of the structure. For the mission to polar region of Moon, the lander will feature side-mounted solar panels and ortho-gird panels to accommodate a payload, as well as landing gear. The onboard rover will be deployed using the ramps. An alternate configuration with horizontal payload decks, sturdy legs and a top-mounted solar panel is also available. The integrated avionics unit (IAU) of thePeregrine lander houses nine modules onboard. A payload controller will be placed within the IAU for managing individual payloads. It consists of error detection and correction (EDAC) and upset monitoring equipment. The lander features an X-band range transponder for uplink and downlink communications. The connection between the spacecraft and payload is ensured by serial RS-422 wired communication. The propulsion system of the lander consists of five main engines and 12 ISE-5 attitude control thrusters, driven by a hypergolic bipropellant. The main engines produce 667N thrust, while the ACS thruster produces 45N. The fuel used for the engine is mono-methyl-hydrazine (MMH), while mixed oxides of nitrogen (MON-25) is used as an oxidizer for the propulsion system. United Launch Alliance (ULA) was awarded a contract to launch the first Peregrine lunar delivery mission by Astrobotic. The Peregrine lander will be carried as a secondary payload onboard ULA Atlas V launch vehicle. The first mission, named Mission One, is planned to be launched to its target landing site Lacus Mortis, a plain in the north-east region of Moon, in June 2021. The mission duration is expected to be two months. NASA is providing spacecraft engineers and facilities required for the construction of the Peregrine mission, while Orbital ATK is supplying four 22in tanks. Airbus Defence and Space is providing initial engineering support for the spacecraft, while DHL will provide logistics services for the lunar lander and its customer payloads. Dynetics is supplying the propulsion system for the Peregrine moon lander, while the engines are being procured from Frontier Aerospace. Other companies involved include Atlas Space Operations, Northrop Grumman and Cobham.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data