logo

Performing the capital work to separate the drinking water and the sewer line as the water line is crossing the sewer line (phase 2 of 2)

Sector: Waste Processing and Treatment • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

After phase 1 (design) is complete, the drinking water line that is currently passing through the sanitary sewer line will be physically separated (phase 2 of 2). Objective: To separate the watermain from the sewer main as required by regulation. Scope: Purchase all required materials, excavate, traffic control, follow all pertinent regulations pertaining to water and sewage infrastructure, follow

Project Information FAQ

Project Information

3 Q
The project “Performing the capital work to separate the drinking water and the sewer line as the water line is crossing the sewer line (phase 2 of 2)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

After phase 1 (design) is complete, the drinking water line that is currently passing through the sanitary sewer line will be physically separated (phase 2 of 2). Objective: To separate the watermain from the sewer main as required by regulation. Scope: Purchase all required materials, excavate, traffic control, follow all pertinent regulations pertaining to water and sewage infrastructure, follow American Water Works Association disinfection procedure for new construction, provide manpower, perform required sample as per standard, backfill and cover as describe in drawings. Output: Eliminate the cross connection and leave pipework in a state which is up to code to ensure that water that’s safe for human consumption is delivered while ensuring the collection system at the location is also intact and up to code.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data