Perfumania #2831 - Perimeter Mall (Atlanta, GA)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Existing Partition/ Ceiling Modifications. * All New Partitions Per Partition Legend. * Existing Electrical Panel(S) To Remain. Provide New Receptacles & Lighting Per Drawings. * Existing Nc Unit(S), Ductwork & Diffusers To Remain/ Be Reworked. Provide New A/c Unit, Ductwork & Diffusers Per Engineering Dwgs. * Provide New Acoustical Ceiling Tile & Grid Per Drawings.
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Perfumania #2831 - Perimeter Mall (Atlanta, GA)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Existing Partition/ Ceiling Modifications. * All New Partitions Per Partition Legend. * Existing Electrical Panel(S) To Remain. Provide New Receptacles & Lighting Per Drawings. * Existing Nc Unit(S), Ductwork & Diffusers To Remain/ Be Reworked. Provide New A/c Unit, Ductwork & Diffusers Per Engineering Dwgs. * Provide New Acoustical Ceiling Tile & Grid Per Drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
