PERIYAR VAGAI II
Sector: Water Supply and Storage • Location: India
Source: World Bank Group
The Periyar Vaigai Irrigation II Project will complete the Periyar Vaigai Irrigation Project (Cr. 720-IN), extend its irrigable area (73,600 ha) by another 7,500 ha and maximize crop production and farmers' incomes in the 81,100 ha project area through better water utilization. To achieve these objectives, the project will: (i) improve an equitable and reliable water supply in the command area; an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Periyar Vaigai Irrigation II Project will complete the Periyar Vaigai Irrigation Project (Cr. 720-IN), extend its irrigable area (73,600 ha) by another 7,500 ha and maximize crop production and farmers' incomes in the 81,100 ha project area through better water utilization. To achieve these objectives, the project will: (i) improve an equitable and reliable water supply in the command area; and (ii) improve water distribution among farmers below the 10 ha block outlets and promote better water management on the farm. This will require a number of complementary activities, including strengthening of the project organization for operation and maintenance, on-farm development, introduction of rotational water supply below the block outlet, establishment of farmer organizations, and training of project staff and farmers in new management practices. As this is an integral part of a continuing project the risks are considered less than average for irrigation projects of similar size and scope. Cost estimates are firm as they are based on the experience of the on-going project. Projections of yields are conservative and are well within the reach of the average farmer's capability. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
