Perkins Road-Mulkey Bridge Repair
Sector: Bridge • Location: Millen, Georgia, United States of America
Source: Dodge USA
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Repair the Mulkey Road bridge abutment washout area. This work will include the excavation of existing material, prepare and pour a concrete wall between the piers and abutment area, remove existing asphalt base and roadway and replace road surface.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Repair the Mulkey Road bridge abutment washout area. This work will include the excavation of existing material, prepare and pour a concrete wall between the piers and abutment area, remove existing asphalt base and roadway and replace road surface. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
