logo

Permanent Replacement of Structurally Deficient Wooden Bridge in Idaho

Sector: Bridge • Location: Idaho, United States

Source: The Manila Times

Project
Completed

Acrow has delivered a permanent replacement for a structurally deficient wooden bridge located in Idaho. The project involved replacing the old wooden bridge with a new, permanent structure to ensure safety and durability.

Status
Closed
Sector
Bridge
Location
Idaho, United States of America
Updated
22 Jul 2026
Source
The Manila Times

ConstructChat

Ask ConstructChat about Permanent Replacement of Structurally Deficient Wooden Bridge in Idaho

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Permanent Replacement of Structurally Deficient Wooden Bridge in Idaho” is an infrastructure initiative in the Bridge sector, located in Idaho, United States. Taiyo aggregates data on it from The Manila Times.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Acrow has delivered a permanent replacement for a structurally deficient wooden bridge located in Idaho. The project involved replacing the old wooden bridge with a new, permanent structure to ensure safety and durability.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Idaho

Source

Source

The Manila Times

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-04-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project