logo

Perry Street Storage Buildings

Sector: Commercial • Location: Carson, California, United States of America

Source: Dodge USA

Project
Delayed

The Project proposes the development of a self-storage facility with three buildings totaling approximately 118,928 square feet. The self-storage facility would be comprised of a mix of one- and two-story buildings with a maximum height of approximately 25 feet to parapet and 31 feet to peak of roof elements. The self-storage facility would include a 1,641 square foot lobby, a 1,550 square foot re

Status
Failure
Sector
Commercial, Warehouse, Consumer Products, Residential, Road, Steel, Raw Materials
Location
Carson, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Perry Street Storage Buildings

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Perry Street Storage Buildings” is an infrastructure initiative in the Commercial sector, located in Carson, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project proposes the development of a self-storage facility with three buildings totaling approximately 118,928 square feet. The self-storage facility would be comprised of a mix of one- and two-story buildings with a maximum height of approximately 25 feet to parapet and 31 feet to peak of roof elements. The self-storage facility would include a 1,641 square foot lobby, a 1,550 square foot retail use (likely a cafe), and a 1,575 square foot retail use (likely a mail service store such as...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Carson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Warehouse, Consumer Products, Residential, Road, Steel, Raw Materials

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project