logo
ProjectPre-Design

Perryman Drive Extension

One of 9,133 projects Taiyo tracks in Maine.

Source: Dodge USA

The intersection of Bath Road and Thomas Point Road currently function at a Level of Service of F indicating that those utilizing the intersection experience significant delay when entering and existing the intersection. The intersection is classified as a high crash location by the MaineDOT and is considered a contributing factor in the high crash location at the intersection of Bath Road and Gur

Status
Prospective
Sector
Power Transmission, Road, Government, Commercial, Raw Materials, Power Generation (CCGT)
Location
Brunswick, Maine, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Perryman Drive Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Perryman Drive Extension” is an infrastructure initiative in the Power Transmission sector, located in Brunswick, Maine, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The intersection of Bath Road and Thomas Point Road currently function at a Level of Service of F indicating that those utilizing the intersection experience significant delay when entering and existing the intersection. The intersection is classified as a high crash location by the MaineDOT and is considered a contributing factor in the high crash location at the intersection of Bath Road and Gurnet Road. To address both the Level of Service and accident concerns of the MaineDOT Perryman Dri...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maine

City

Brunswick

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Road, Government, Commercial, Raw Materials, Power Generation (CCGT)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project