logo
ProjectClosed

Persistent Organic Pollutants (POPs) Stockpiles Management & Destruction GEF Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The Persistent Organic Pollutants (Pops) Stockpiles Management and Destruction Project for Moldova aims to protect the environment and human health by safely managing and disposing of stockpiles of POPS contaminated pesticides and Polychlorinated biphenyls (PCBs). The global project objective of the project is sustainable POPS stockpiles management and strengthening of the regulatory and intuition

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Government
Location
Moldova
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Persistent Organic Pollutants (POPs) Stockpiles Management & Destruction GEF Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Persistent Organic Pollutants (POPs) Stockpiles Management & Destruction GEF Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Moldova. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Persistent Organic Pollutants (Pops) Stockpiles Management and Destruction Project for Moldova aims to protect the environment and human health by safely managing and disposing of stockpiles of POPS contaminated pesticides and Polychlorinated biphenyls (PCBs). The global project objective of the project is sustainable POPS stockpiles management and strengthening of the regulatory and intuitional arrangements for long term control of POPS and other toxic substances in line with the requirements of the Stockholm Convention and other related conventions and protocols ratified by Moldova. The project has three components. The first component consists of two sub-components. Subcomponent 1 will finance the repackaging and final destruction by incineration of approximately 1,150 tons of POPS containing and contaminated obsolete pesticides. Sub-component 2 consists of three activities: (1) establishing an inventory of PCB containing or contaminated equipment; (2) destruction of a stockpile of obsolete capacitors that would include the following: (a) dismantling of 17,300 obsolete capacitors from thirteen substations and packing in closed containers; (b) excavation of 2,000 capacitors buried in two pits in the Vulcanesti substation and packing in closed containers; (c) destruction of 19,300 capacitors and up to 50 tons highly polluted soil through incineration; and (3) a feasibility study of site clean-up at Vulcanesti Substation. Component 2 includes actions for modernization of current legislation specifically related to the Stockholm Convention and incorporation of provisions for establishing a broader chemical safety approach in the country based on European Union legislation. The third component will support two type of activities: (1) institution strengthening; and (2) project management.

Original sector

FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Moldova

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project