Perth Law Library Structural Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Rehabilitation work includes grouting of rubble stone walls, re-pointing and stabilization of stone exterior, excavation and placement of frost protecting insulation around the building, and general masonry repairs including stone work, and reinforcing with masonry stitching anchors. Refer to drawings and specifications for detailed scope of work.
- Status
- Closed
- Sector
- Commercial, Cement, Education, Road, Manufacturing (Industrial)
- Location
- Perth, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Perth Law Library Structural Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitation work includes grouting of rubble stone walls, re-pointing and stabilization of stone exterior, excavation and placement of frost protecting insulation around the building, and general masonry repairs including stone work, and reinforcing with masonry stitching anchors. Refer to drawings and specifications for detailed scope of work. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Perth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Education, Road, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
