Peru - Ecuador 500 kV Transmission Line Interconnection PPP project
Project awarded · Piura
Source: InfraPPPWorld
The project involves the construction of a 500 kV Transmission Line that will link the Chorrillos Substation in Ecuador with the La Niña Substation in Peru (La Línea).The project includes constructing a Transmission Line spanning approximately 270.3 km within Peruvian territory, connecting the Piura Nueva Substation to the border crossing point. Similarly, in Ecuadorian territory, the interconnect
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Piura, Peru
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Peru - Ecuador 500 kV Transmission Line Interconnection PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a 500 kV Transmission Line that will link the Chorrillos Substation in Ecuador with the La Niña Substation in Peru (La Línea).The project includes constructing a Transmission Line spanning approximately 270.3 km within Peruvian territory, connecting the Piura Nueva Substation to the border crossing point. Similarly, in Ecuadorian territory, the interconnection section begins at the Pasaje substation and covers a distance of 74 km to the border. This project aims to enhance energy supply security for both Peru and Ecuador, improving reliability and the efficiency of electricity transportation. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Peru |
State | Piura |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
