Peru Lima Metro Line 2 Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for
- Status
- Closed
- Sector
- Mass Transit, Airport, Rail, Automotive, Tunnel, Commercial, Government, Telecommunications
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Peru Lima Metro Line 2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for the construction of the lima metro line two’. The Metro Line Two Project includes the implementation of 35 Km of new urban rail infrastructure, to include the support for the provision of the following: (i) the construction of 35 stations with, at a minimum, physical integration to the existing Metro Line One and Metropolitan BRT; (ii) construction of approximately 27.3 Km of tunnel along the Line two corridor with one rail yard; (iii) construction of approximately 7.7 Km segment of the future line four branch with one rail yard; and (iv) the provision and installation of the necessary rolling stock, electrical, control, telecommunications, and fare systems for operation of the Metro Line two. The project will be entirely underground with approximately 32 shafts for ventilation and emergencies, one additional emergency shaft, two rail yards, and electromechanical, structural and rail facilities. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Airport, Rail, Automotive, Tunnel, Commercial, Government, Telecommunications |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
