logo

Peru Lima Metro Line 2 Project

Sector: Mass Transit • Location: Peru

Source: World Bank

Project
Closed

The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for

Project Information FAQ

Project Information

5 Q
The project “Peru Lima Metro Line 2 Project” is an infrastructure initiative in the Mass Transit sector, located in Peru. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for the construction of the lima metro line two’. The Metro Line Two Project includes the implementation of 35 Km of new urban rail infrastructure, to include the support for the provision of the following: (i) the construction of 35 stations with, at a minimum, physical integration to the existing Metro Line One and Metropolitan BRT; (ii) construction of approximately 27.3 Km of tunnel along the Line two corridor with one rail yard; (iii) construction of approximately 7.7 Km segment of the future line four branch with one rail yard; and (iv) the provision and installation of the necessary rolling stock, electrical, control, telecommunications, and fare systems for operation of the Metro Line two. The project will be entirely underground with approximately 32 shafts for ventilation and emergencies, one additional emergency shaft, two rail yards, and electromechanical, structural and rail facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data