logo
ProjectClosed

Peru Lima Metro Line 2 Project

One of 8,755 projects Taiyo tracks in Peru.

Source: World Bank

The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for

Status
Closed
Sector
Mass Transit, Airport, Rail, Automotive, Forest Products and Packaging, Tunnel, Commercial, Government, Telecommunications
Location
Peru
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Peru Lima Metro Line 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Peru Lima Metro Line 2 Project” is an infrastructure initiative in the Mass Transit sector, located in Peru. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for the construction of the lima metro line two’. The Metro Line Two Project includes the implementation of 35 Km of new urban rail infrastructure, to include the support for the provision of the following: (i) the construction of 35 stations with, at a minimum, physical integration to the existing Metro Line One and Metropolitan BRT; (ii) construction of approximately 27.3 Km of tunnel along the Line two corridor with one rail yard; (iii) construction of approximately 7.7 Km segment of the future line four branch with one rail yard; and (iv) the provision and installation of the necessary rolling stock, electrical, control, telecommunications, and fare systems for operation of the Metro Line two. The project will be entirely underground with approximately 32 shafts for ventilation and emergencies, one additional emergency shaft, two rail yards, and electromechanical, structural and rail facilities.

Original sector

FY17 - Transportation

Budget

Location

Country

Peru

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Mass Transit, Airport, Rail, Automotive, Forest Products and Packaging, Tunnel, Commercial, Government, Telecommunications

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project