Pesotum IL Tower Light Replacement
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
Remove old nonfunctioning Light system top beacon, side marker light, control box, and old wiring. Provide and install new LED tower light kit meeting FAA specs and the avian flashing requirement, system will include daytime white flash/red night flash top beacon and LED side marker lights, if applicable. Install new appropriate cable for LED light system. System will operate on 120 volts ac and h
- Status
- Closed
- Sector
- Telecommunications, Government, Manufacturing (Industrial), Commercial
- Location
- Pesotum, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pesotum IL Tower Light Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove old nonfunctioning Light system top beacon, side marker light, control box, and old wiring. Provide and install new LED tower light kit meeting FAA specs and the avian flashing requirement, system will include daytime white flash/red night flash top beacon and LED side marker lights, if applicable. Install new appropriate cable for LED light system. System will operate on 120 volts ac and have an external photocell to switch between day and night operations. New LED lighting system wil... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Pesotum |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
