Peterhead Replacement Gas Power Station
Planned · Scotland · Last reported Jan 2022
Source: The National
Plans for a replacement gas power station in Peterhead, Aberdeenshire, proposed by SSE and Equinor in 2022. The project depends on the Acorn carbon capture project to store carbon emissions, which has faced setbacks including the main backer Storegga pulling out after a strategic review. The project has not yet received planning permission and is reliant on public funding.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Residential, Commercial
- Location
- Peterhead, Scotland, United Kingdom
- Updated
- 19 Nov 2026
- Source
- The National
ConstructChat
Ask ConstructChat about Peterhead Replacement Gas Power Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Plans for a replacement gas power station in Peterhead, Aberdeenshire, proposed by SSE and Equinor in 2022. The project depends on the Acorn carbon capture project to store carbon emissions, which has faced setbacks including the main backer Storegga pulling out after a strategic review. The project has not yet received planning permission and is reliant on public funding. |
Original sector | Energy |
Budget |
Location
Country | United Kingdom (UK) |
State | Scotland |
City | Peterhead |
Source
Source | The National |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
