Peters First Nation - Fraser River Flood Control Berm
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
This project is to construct a 1km long flood control berm along IR2 to reduce flood risk to the community as well as to reduce the likelihood of river avulsion across the IR2 island towards IR1. Avulsion across the IR2 island would increase the water level and velocity of flood flow across the community of IR1 and potentially result in sizable if not total loss of the IR1 residences and infrastru
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Peters First Nation - Fraser River Flood Control Berm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to construct a 1km long flood control berm along IR2 to reduce flood risk to the community as well as to reduce the likelihood of river avulsion across the IR2 island towards IR1. Avulsion across the IR2 island would increase the water level and velocity of flood flow across the community of IR1 and potentially result in sizable if not total loss of the IR1 residences and infrastructure. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
