Petro Canada RCP 1.1 Civil Works
Sector: Cement • Location: Canada
Source: Bird Construction
The 6,500 cubic yard concrete coker structure was constructed with access only from one end and included a 3,500 cubic yard monolithic base. The base required 350 truck loads of concrete, four pumps and was completed in 14 hours with commendations from the client for its successful execution. The elevated portion of the coker went through the winter under heated enclosure in a congested work area.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The 6,500 cubic yard concrete coker structure was constructed with access only from one end and included a 3,500 cubic yard monolithic base. The base required 350 truck loads of concrete, four pumps and was completed in 14 hours with commendations from the client for its successful execution. The elevated portion of the coker went through the winter under heated enclosure in a congested work area. The lack of lay down space required significantly more planning and coordination. An additional elevated structure, the vacuum tower, involved a ring beam atop 12 columns that were over 63 feet high. Bird simultaneously completed the concrete and shallow underground piping work in the nearby sulphur block under separate contract. Bird simultaneously completed the concrete and shallow underground piping work in the nearby sulphur block under separate contract. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
