logo

PETRO IVOIRE II

Sector: Residential • Location: Cote D'Ivoire

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameCote d''Ivoire-Petro Ivoire II     RegionSub-Saharan AfricaSectorProject No008656Projected Board DateJanuary 29, 1999Company NamePetro Ivoire S.A.Technical Partner and/or Major Shareholders PI is owned 55% by a group of Ivorian investors, of which 43.6% is owned by Messrs. Morrisson, Morokro (Chairman) and Marceau (Vice President Finance), the foundi

Project Information FAQ

Project Information

4 Q
The project “PETRO IVOIRE II” is an infrastructure initiative in the Residential sector, located in Cote D'Ivoire. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameCote d''Ivoire-Petro Ivoire II     RegionSub-Saharan AfricaSectorProject No008656Projected Board DateJanuary 29, 1999Company NamePetro Ivoire S.A.Technical Partner and/or Major Shareholders PI is owned 55% by a group of Ivorian investors, of which 43.6% is owned by Messrs. Morrisson, Morokro (Chairman) and Marceau (Vice President Finance), the founding group of Ivorians; Messrs. Morokro and Kakou have over 25 years experience in the Petroleum Products distribution sector as senior managers at the Shell Group. Project Cost Including proposed IFC investment The project cost is US$5.2 million and IFC''s proposed investment is a US$2.9 million equivalent guarantee of a local currency loan.Location of project and Description of site The Company is located in Abidjan, Cote d''Ivoire. Five of the new stations will be located in Abidjan, and the other five in secondary Cote d''Ivoire cities.Description of Company and Purpose of Project The project is for Petro Ivoire to contruct ten new gas stations over three years (1999-2001) and increase its gas station network from its current eleven to twenty one stations. Petro Ivoire, founded in 1994 as the sole Ivorian-owned Petroleum Products distributor in the country, is currently operating eleven gas. IFC (through the AEF) helped the Company in its first expansion in CY1995/6 when it added 4 gas stations. The purpose of the project is to increase the Company''s presence in the retail gas station segment.Environmental Category and Issues This is a category B project according to IFC''s environmental review procedure. The siting of new service stations will consider issues such as the location of power lines and transformers, depth to groundwater table, and distance to existing residential areas. Petro Ivoire will install underground petroleum storage tanks at the retail stations, as well as large above ground tanks at the central depot. Each underground/aboveground tank will be provided with secondary containment and will have the proper ventilation equipment and ancillary facilities for periodic inspection, spill prevention and ongoing maintenance. Storm drains that collect rain runoff from the gas station property and any oily wastewater generated at each station will be treated in an oil/water separator prior to discharge to the local drainage system. Appropriate measures are being taken in the design of all facilities to provide fire protection and facilitate early alarm in case of fire. Fire hydrants and portable fire extinguishers will be located at strategic points throughout each retail station. Petro Ivoire is committed to implementing a strong occupational health and safety policy, organizing effective safety training, providing medical services, supplying personal protective devices for its employees and providing appropriate equipment safeguarding. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet World Bank policies, and environmental, health and safety guidelines.The is from the Public Information Center.Date SPI sent to PIC December 15, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data